Scaling and structuring an industrial CAPEX programme
A technology-driven start-up was making the transition from development and pilot operation to the industrial production of a novel high-performance material.
Anonymised case studies from restructuring, strategy, operational improvement, transactions, executive search and governance.
A technology-driven start-up was making the transition from development and pilot operation to the industrial production of a novel high-performance material.
An international supplier of special-purpose machinery, plants and services for high-precision manufacturing processes, with revenues of around €100 million and 570 employees, needed to improve its competitiveness and earnings base.
An international special-purpose machinery manufacturer with revenue of around €100 million and 570 employees was heavily shaped by the transformation of the automotive industry, particularly e-mobility.
An international manufacturer of machinery and system solutions with revenue of around €100 million and some 570 employees was under considerable earnings and transformation pressure.
An international special-purpose machinery manufacturer with revenue of around €100 million and 570 employees faced a comprehensive transformation due to changed market conditions and high demands on cost, projects and portfolio.
An international machinery and plant engineering company with revenue of around €100 million and some 570 employees was undergoing a comprehensive transformation.
A supplier of formwork and scaffolding systems had acquired a stake in a specialised industrial service provider to gain access to industrial scaffolding.
An international chemicals producer operated a large German production site with extensive technical services, energy supply, infrastructure and logistics.
At a large chemical site, workshops, rail operations, loading, shipping, dispatch and other logistics services had historically been integrated into the site organisation.
Alongside production, two large German chemical production sites had extensive units for maintenance, engineering, logistics, energy, infrastructure, safety and environmental protection.
Two German chemical plants with around 700 employees were under considerable cost and competitive pressure.
The technical organisation of a large chemical site had its own maintenance workshops, technical planning, installation services and an extensive materials and spare-parts store.
Two large German production sites of an international chemical company had complex production, engineering, infrastructure and service organisations with a total of around 700 employees.
Alongside its production plants, a large chemical producer operated extensive energy, infrastructure and site services.
The managing director position at a mid-sized, labour-intensive industrial company within a larger engineering and plant construction group was to be filled.
An internationally active business unit for measurement technology and analyser systems, with revenues of around €20 million and 90 employees, belonged to a private-equity-owned technology group.
A private equity-owned global business unit for measurement and analytical systems, with revenue of around €20 million and 90 employees, had been loss-making for several years.
An international business unit for measurement and analytical systems with revenue of around €20 million and 90 employees had been loss-making for several years.
Continued support as advisor and coach to the incoming head of the business unit, following the successful completion of an interim management and turnaround mandate.
An independent engineering company serving the pharma, chemicals and metals industries had grown by around 25 to 30 per cent a year over four years to some 200 employees.
As part of a performance improvement project at an international chemicals company, indirect technical spend and potential savings were examined.
Non-executive director / board member of an international maintenance and industrial services division with revenues of around US$200 million within a large family-owned engineering group.
A family-owned international technology group in machinery and plant engineering, with revenues of around €200 million and 1,100 employees, had been loss-making for several years. A restructuring plan under IDW S6 was already in place.
An international machinery group was in an advanced earnings and financing crisis.
An international machinery and plant engineering company had numerous restructuring activities under way, but no overarching structure for consistent steering and execution.
An international technology group in machinery and plant engineering with revenue of around €200 million and 1,100 employees operated production plants as well as sales and service companies worldwide.
CEO and Chief Restructuring Officer of an international machinery and plant engineering group with revenue of around €200 million, 1,100 employees and numerous production, sales and service companies abroad.
An international technology group in machinery and plant engineering with revenue of around €200 million, 1,100 employees and production, sales and service companies worldwide was in a strained economic situation.
In the restructuring of a global machinery and plant engineering company, the new-plant business was of particular importance because of its considerable earnings leverage.
A global leader in industrial equipment was to be positioned as significantly more independent, leaner and more competitive within a large technology group.
A global industrial company was to become significantly more independent within a large corporate group while being prepared for possible future M&A, joint-venture or other ownership structures.
The marine business of an international plant engineering company faced growing competitive pressure in a consolidating global market.
A large operator of an integrated chemical park was in the middle of a transformation and needed to replace the managing director of a technical services subsidiary at short notice.
After winning a major integrated facility management contract, a new nationwide organisation covering around €500 million in business volume, some 6,000 employees and several thousand sites had to be set up within a short time.
After winning a nationwide integrated facility services contract, a new organisation had to be built for a business volume of around €500 million and some 6,000 employees.
After winning a nationwide integrated facility services contract with revenue of around €500 million, operational structures for some 6,000 employees had to be set up or transferred within a short time.
A newly won nationwide integrated facility services contract with revenue of around €500 million and some 6,000 employees had to be transferred from the previous operating model into a new service organisation within a tight time frame.
After winning one of the largest facility and infrastructure services contracts in Germany, a nationwide service model with a contract volume of several hundred million euros had to be put into operation.
A building and utility services business unit with revenues of around €70 million and 400 employees belonged to a larger German plant engineering group.
The building services segment of a larger plant engineering and technical services company comprised HVAC, electrical, instrumentation and control, and fire protection activities for industrial, infrastructure and building clients.
A business unit for energy and building technology with revenue of around €70 million and some 400 employees handled large national and international projects.
A business unit for building and utility technology with revenue of around €70 million and 400 employees was in a phase of stabilisation and realignment after organisational changes and demanding project developments.
A chemical park operator with revenues of more than €300 million owned a technical services company with revenues of around €50 million.
A technical service provider at a large industrial site with revenue of around €50 million was to be strategically repositioned and prepared for a possible change of ownership.
An international private equity investor focused on energy and industrial services was looking for additional platforms and add-on acquisitions in Europe.
As part of a transaction review, a large operator of chemical parks and energy, infrastructure, logistics and technical services was assessed.
A listed investment company wanted to broaden its access to attractive mid-market transaction opportunities through experienced industry experts.
An internationally active division with revenues of around €200 million and 1,400 employees provided engineering, installation, maintenance and project services for the energy and process industries.
For years, an international industrial services group had been burdened by changing structures, insufficient integration and structurally unprofitable activities.
The division of an international industrial group consisted of historically very different companies in seven countries, with revenue of around €200 million and 1,400 employees.
In addition to serving as CEO of an international division with revenue of around €200 million and 1,400 employees, assumption of several formal statutory and governance roles in foreign subsidiaries.
The international companies of an industrial services division worked with different and in some cases outdated systems, processes and management logic.
A major international project of an industrial and plant engineering service provider was largely complete operationally, but commercially in a critical situation.
An international industrial services division provided technical services to customers with particularly high requirements for quality, safety and asset availability, including nuclear power plants.
An international division of an industrial group, with revenues of around €200 million and 1,400 employees, provided engineering, project and service work for the energy, oil, gas and process industries. The group decided to sell its industrial services activities to a private equity investor.
An international industrial group decided to divest its large industrial services business.
Several engineering, installation, maintenance and service units of an international industrial services group were to be combined into a stronger platform for the process industries and the energy sector.
A provider of engineering, plant construction, installation and maintenance for the process industry had revenue of around €110 million and 850 employees.
A leading service provider to the process industry and energy sector combined engineering, plant construction, installation, maintenance and technical services in one organisation with revenue of more than €100 million and over 800 employees of its own.
Industrial customers were increasingly looking for service partners that not only carry out individual maintenance tasks but take responsibility for larger parts of the maintenance process.
Together with a leading plant engineering and technology group, an innovative biomass gasification technology was to be turned into an industrially scalable plant concept and commercialised.
A comprehensive mechanical maintenance model was to be developed for two large refinery sites.
To expand the maintenance outsourcing business, industrial companies with high optimisation and outsourcing potential were to be systematically identified and assessed.
Industrial customers were increasingly looking for ways to modernise energy infrastructure without bearing all investment and operating risks themselves.
An international energy and infrastructure service provider wanted to expand its business with industrial customers in Germany.
A large industrial site was examining a new operator and supply structure for energy, utilities and technical site services.
A chemical company was considering outsourcing key energy, infrastructure and site services to a specialised operator.
An international energy and environmental services group wanted to expand its German industrial business significantly beyond conventional energy and contracting solutions.
Rising energy prices, CO₂ requirements and new regulatory frameworks increased the need for more efficient energy supply solutions among industrial and commercial customers.
Large industrial companies were increasingly considering outsourcing technical services, energy supply and infrastructure services to specialised operators.
International industrial customers were looking for service and outsourcing models for technical services and infrastructure that could be deployed across countries.
Shareholder representative of a technical services subsidiary within an international energy and infrastructure services group.
A large industrial service provider’s business in major overhauls and turnarounds at refineries was project-driven, cyclical and characterised by strong price and competitive pressure.
A technical industrial service provider carried out maintenance, installation and turnaround services for refineries and other process industry companies.
Planned major refinery shutdowns require the coordinated execution of extensive maintenance, inspection, repair and installation work within tightly defined time windows.
After several organisational changes, a large industrial services organisation was to develop its performance, processes and management structures systematically.
Industrial customers were increasingly reducing their own technical services and expected service partners to provide more comprehensive solutions beyond individual trades.
Two key customer relationships in the refinery and process industries accounted for a considerable share of the regional service business.
As part of a major investment of around €600 million in a refinery, extensive mechanical plant construction and installation work was put out to tender.
Advisory board member of a subsidiary providing skilled labour, installation and industrial services during the period in the international industrial services business.
A regional industrial services organisation provided technical services to large sites in the chemical and process industries.
A region of a large industrial service provider was responsible for chemical park management, energy and utilities supply, maintenance and projects, with revenue of around €50 million and 380 employees.
At a large chemical production site, infrastructure, utilities, engineering, safety, environmental protection, laboratory, procurement and materials management were closely integrated into the production organisation.
The central site services of a chemical plant comprised infrastructure and utilities, engineering, safety and environmental protection, laboratory, procurement and materials management.
A large chemical site had an extensive in-house organisation for maintenance, project engineering, utilities, technical services, procurement and materials management.
A large chemical site operated complex production plants as well as its own technical services, infrastructure and utility systems.
Several complex petrochemical production and auxiliary plants were operated in fully continuous mode.
Production units of an international chemicals and pharmaceuticals group were under constant pressure to improve plant costs, use of resources and competitiveness.
The central engineering organisation of an international chemicals and pharmaceuticals group planned and executed capital projects for production sites with demanding process technology.
The German subsidiary of an international energy and infrastructure group wanted to expand its market position in the industrial infrastructure business considerably.
As part of an inorganic growth strategy, the potential acquisition of an energy contracting company with revenues of around €70 million was examined.
Two German companies of an industrial group with combined revenues of around €120 million operated in a highly competitive installation and service business.
A company with revenues of around €20 million manufactured and installed insulation, fire protection and sound insulation systems for industry and building services.
An industrial service provider with revenues of around €120 million had four business units with long-standing experience in the nuclear power plant business.
A chemical production organisation had to improve its competitiveness while meeting high requirements for asset availability, safety and product quality.
A group had set up an independent start-up to develop, market, build and operate innovative large-scale renewable energy plants.
An international industrial services group wanted to expand its portfolio with higher-value technical services.
An industrial services company wanted to expand its engineering and technology expertise in innovative energy and biomass plants and examined a strategic investment in a technology company for this purpose.
Within an international engineering and services group, two companies with complementary technical capabilities were to be merged.
Two regional industrial service companies of an international group were to be merged into a larger joint maintenance company.
Two larger industrial services organisations of a group were to be merged and developed further under a new joint market positioning.
A large chemical site had historically been organised as the integrated production site of a single group.
An international industrial services group was looking for acquisition opportunities to expand its engineering and technology portfolio.
To expand its own service and technology portfolio, an international industrial service provider examined various smaller, strategically relevant business units and companies.
2,000 employees · €500 million annual revenue · 20,000 SKUs · worldwide · 15 months
Group with revenues of around €4 billion · many independent individual companies
European funding instrument · funding volume around €70 billion · individual grants €0.5 to 2.5 million
At a consumer goods company, demand planning, production planning and materials management were the responsibility of the German SCM function.
A mid-sized cosmetics company added its own online shop to its sales channel through beauty salons.
The management of a mid-sized cosmetics company commissioned the search for a head of research, development and innovation.
A consumer goods company’s shipping warehouse picked orders using a pick-by-light system.
Shortly before the launch of an international airline portal, the project was in a critical phase.
In packaging procurement, framework contracts, rolling demand notifications and individual orders came together.
A growing cosmetics group needed additional production and warehouse capacity.
In the German organisation of a consumer goods and pharmaceutical company, sales forecasts formed the basis of production planning.
A cosmetics group wanted to develop its production planning further.
A medical devices company was looking to strengthen its strategic procurement team.
A company in the pharmaceutical and consumer goods industry brought together demand planning, production control, operational procurement, materials management and distribution logistics in Germany.
In the procurement function of a cosmetics group, prices for raw materials and packaging were to be improved.
An international diagnostics company was consolidating the operation of its websites.
As a cosmetics group grew, its product range, sales volumes and number of sales channels increased.
In the German organisation of a pharmaceutical and natural cosmetics company, FuturMaster was to support demand planning.
The German SCM organisation of a pharmaceutical and consumer goods company managed operational procurement and material supply.
For a new production centre, supplying manufacturing from an automated warehouse had to be organised.
The procurement function of a consumer goods company was heavily tied up with operational transactions.
At an industrial company, even simple indirect requirements went through an elaborate procurement process.
During the ramp-up of a production site, new and existing filling lines, staff and material supply had to be aligned.
Following the acquisition of a server business, its spare parts supply had to be integrated into the existing logistics and service processes.
The management of a mid-sized education company needed a reliable picture of the funds available in the short term.
A consumer goods group reorganised its product development into interdisciplinary teams.
At an industrial contract manufacturer, procurement, planning, production and logistics were under heavy operational strain.
A manufacturing company was working on improvements in production, procurement, logistics and production planning in parallel.
In a consumer goods group, SCM had to manage inventory across different product ranges and business units.
In a consumer goods group, sales, planning and operations worked with sales forecasts.
At a shift-based manufacturing company, the available workforce had to be deployed in line with operational capacity utilisation.
As part of the modernisation of an existing logistics facility, a consumer goods group introduced a new warehouse management system.
A consumer goods group shipping internationally wanted to reduce effort in shipping processing and improve compliance with customs requirements.
A manufacturing company wanted to manage production orders and material movements more transparently using a manufacturing execution system.
A group with several business units faced decisions on the future direction of operations and the supply chain.
In the high-variety filling operation of an industrial company, product and format changes affected usable machine time.
An SCM organisation was implementing change with its own teams and neighbouring functions.
An industrial company used regular truck shuttles to supply production.
At a manufacturing company, the item master had grown over a long period.
A mid-sized company was planning to extend its production hall.
At a mid-sized company, expanding the existing ERP and introducing additional production planning software were under discussion.
An education company with a specialised premium offering wanted to develop its business further.
A newly assembled key account team was to manage shared customer relationships.
In the sales function of an industrial company, several development topics were on the agenda at the same time.
A technical procurement function wanted to use generative AI in its own work.
At an industrial contract manufacturer, short-term changes to the production plan led to frequent interventions in sequencing.
At a contract manufacturer, raw materials, finished goods and stock awaiting disposal occupied scarce warehouse and production space.
A mid-sized company was looking for a leader for supply chain management and planning.
A company wanted to fill the head of logistics position.
A cosmetics company was looking to strengthen its strategic raw materials procurement.
A consumer goods company was looking for a leader to manage collaboration with external manufacturers and packaging partners.
A training provider wanted to offer procurement practitioners a practical introduction to generative AI.
A financial services provider’s web hosting operation depended heavily on the knowledge of the incumbent operator.
An industrial company handed over several websites to a hosting provider.
A diagnostics company commissioned the hosting of its Ariba procurement application.
An IT service provider was running several hosting projects in parallel in Germany, Austria and Switzerland.
An international industrial group used different country processes and databases for ordering, asset management and service activation.
An industrial company added a new Windows cluster environment to its IT landscape.
At an industrial company, project responsibility for the service management transition changed shortly before production start.
Natural cosmetics production had to allocate a changing product mix to limited line capacity.
With the introduction of Axapta, the operational procurement function of a pharmaceutical and consumer goods company had to link order processing with demand and materials planning.
For the next generation of the ERP system, production planning, procurement and distribution logistics had to define their requirements jointly.
The German SCM organisation took over the planning of sterile finishing.
A consumer goods company was preparing to bring the manufacture of shower products into its own production.
Dispersed warehouse space and limited capacity called the existing distribution model into question.
The procurement of nursing tea was characterised by long lead times and high inventories.
A pharmaceutical company was relocating the manufacture and finishing of several products between sites and contract manufacturers.
For externally manufactured and finished items, planning relied largely on Excel lists and individual scheduling arrangements.
In a consumer goods group, indirect requirements were triggered decentrally.
A consumer goods group managed the costs of operations and the supply chain across several areas of responsibility.
When awarding filling services, a group also reviewed material supply.
A group had to be able to demonstrate quality assurance even where services were provided externally.
In a consumer goods group, inventory risks arose for different reasons: an item was superseded, a raw material was approaching the end of its shelf life or a batch remained blocked after a complaint.
In packaging development and procurement, packaging management, research and development, engineering and suppliers had to coordinate their approvals.
In the shipping operations of a consumer goods group, Euro pallets left with the goods to transport service providers.
The warehouse logistics of a manufacturing company examined the use of smart glasses for two workflows: assembling orders and putting away goods.
For a company-wide quality initiative, an industrial company needed a robust selection of improvement projects.
In the development of new products, raw material selection and formulation were fixed before procurement sourced the materials.
A mid-sized company wanted to give its employees a shared introduction to generative AI.
After a cross-functional process workshop, a manager at an industrial company faced demanding questions about their own role and collaboration with other functions.
Building an independent consulting and training business required combining different professional competencies into a clear offering.
A mid-sized manufacturing company was working with an older ERP release.
A manufacturing company was looking for a team lead for production planning and control.
For the operation of a business-critical internet application, a change of server hardware and application platform was due.
An internationally active service provider was having a hosting environment prepared for later production operation.
A financial institution and its IT operator used different systems for handling service requests and incidents.
A consulting firm brought together the different functional and industry expertise of several partners.
At a manufacturing company, unprinted packaging materials had to be available for production without building up unnecessarily high inventories.
The distribution logistics of a consumer goods manufacturer had to cope with fluctuating order volumes, promotional peaks and limited warehouse capacity.
An internationally active natural cosmetics manufacturer was launching new product lines and revising existing ranges.
A manufacturer of durable and perishable products managed material supply through an ERP system.
Many of our engagements are subject to confidentiality agreements. We are happy to present further examples in a personal conversation.
A first conversation quickly clarifies what is really at stake and which form of collaboration will work.