Filling backlogs reduced during a production ramp-up and control handed back to the line
Situation
During the ramp-up of a production site, new and existing filling lines, staff and material supply had to be aligned. Backlogs made temporary cross-functional management necessary.
Challenge
A free machine slot alone did not resolve the bottleneck. For a prioritised order, material, staff and a suitable line all had to be available at the same time. If an order was moved, the conditions for subsequent orders changed too. Under these conditions, it had to be determined every day which backlogs could genuinely be cleared.
Approach
Within SCM, we brought together information on order priorities, missing parts and available filling options. As a team, we tracked which orders could be processed on existing or new lines and where material supply or staffing stood in the way of a reallocation. The task force focused on these cross-functional bottlenecks and aligned the remaining tasks with the line organisation.
Outcome
Filling backlogs decreased. The task force’s responsibilities could be handed back to the line. Operations thus resumed control within its regular organisation.