Print approvals and technical tests for multi-part packaging organised
Situation
In packaging development and procurement, packaging management, research and development, engineering and suppliers had to coordinate their approvals. For containers with a separate dispenser, the technical assessment involved several components of the same end product.
Challenge
A print approval for the design did not yet answer which container had been tested with which dispenser. As long as the components could not be clearly distinguished, it was difficult to relate a test result to a later material order.
Approach
As a team, we assessed different processes for print approval and aligned the preferred option with the operational interfaces. For technical testing, we provided for separate material numbers and specifications for container and dispenser. We structured the tests in SharePoint and coordinated the first implementation steps between packaging management, development and engineering.
Outcome
An option for print approval had been selected and first measures had been initiated. The test database created a common basis for assigning technical tests to the respective components.