One truck shuttle taken out of ongoing production logistics

Performance ImprovementIndustrials & Technology

Situation

An industrial company used regular truck shuttles to supply production. The transport cycle and staffing caused recurring effort. The question was whether supply could be organised with less transport effort.

Challenge

In a shuttle service, vehicle movements and staffing are directly linked. Removing a single trip from the schedule only makes economic sense if the remaining cycle can take over the transport task. The cycle and staffing therefore had to be considered together.

Approach

Within the production logistics team, we worked on the existing transport cycle and the associated staffing. We focused the optimisation on one specific shuttle that could be dispensed with and adjusted the cycle accordingly. For the economic assessment, we separated the transport service actually eliminated from its calculated valuation.

Outcome

One truck shuttle was eliminated in ongoing operations. This reduced the regular transport effort in production logistics. The operational effect is directly visible in the service no longer required.

Inotectis GmbH · Oberer-Albaner-Weg 17 · 86911 Dießen am Ammersee · Germany