Situation
Alongside production, two large German chemical production sites had extensive units for maintenance, engineering, logistics, energy, infrastructure, safety and environmental protection.
Challenge
Organisations and capacities that had grown over time were no longer sufficiently aligned with changed utilisation, cost structures and future requirements.
Approach
In the role of project lead and interim Vice President Operations, the overall organisation was redesigned. Roles, responsibilities and service boundaries between production, plant services and infrastructure were reviewed. For individual functions, reorganisation, in-house provision, transfer, outsourcing and alternative operator structures were assessed.
Outcome
A new overall organisational picture was developed and translated into a concrete project and implementation structure. Reorganisations and operational improvements were implemented directly during the engagement.