Owner’s engineering and implementation of strategic site investments
Situation
A large chemical site operated complex production plants as well as its own technical services, infrastructure and utility systems. The technical organisation comprised, among other things, project engineering, construction management, maintenance, energy and utilities supply, and procurement and materials management.
Challenge
Investments had to be planned and implemented while production continued. Technical requirements, profitability, asset availability, safety, environmental protection, procurement and contractor management had to be brought together. At the same time, there was considerable pressure to improve the site’s cost and performance structure.
Approach
Owner-side responsibility for project engineering and construction management and for the adjacent technical and infrastructure functions. Prioritisation and integrated implementation of larger investments and strategic projects, management of internal departments and external partners, and linking investment decisions with operations, maintenance and long-term site development.
Outcome
Larger investments and projects of strategic importance were implemented in an integrated way. At the same time, the technical organisation was developed further and the site’s cost structure improved significantly, including through substantial reductions in fixed and maintenance costs.