Case study 87
Performance improvement of complex petrochemical production plants
Situation
Several complex petrochemical production and auxiliary plants were operated in fully continuous mode. High asset availability, safe production and competitive costs were decisive.
Challenge
Capacity, operating costs and technical performance had to be improved continuously without impairing ongoing production and operational safety.
Approach
Shared responsibility for production and technical performance of the plants, and definition and management of optimisation projects. Operating data, technical analysis, cost control and targeted improvement measures were combined.
Outcome
In one production unit, capacity was increased by more than 20%. At the same time, considerable savings were achieved through detailed cost analyses, savings projects and rigorous cost control.
Inotectis GmbH · Oberer-Albaner-Weg 17 · 86911 Dießen am Ammersee · Germany
info@inotectis.com · +49 (0)8807 2258677 · inotectis.com