Situation

A pharmaceutical company was relocating the manufacture and finishing of several products between sites and contract manufacturers. German SCM had to secure material supply for the transition period and reflect the new manufacturing routes in planning.

Challenge

The right changeover point was different for each preparation. For one product, items could already be created at the new site, while for another a manufacturing issue still had to be resolved. In addition, packaging texts and the sell-off of existing stock had to fit the respective start-up.

Approach

Within German SCM, we coordinated the work packages for different dosage forms. With planning, manufacturing and the responsible functions, we tracked item creation, packaging texts, remaining stock and first production runs per product. We separated transfers already under way from projects where technical questions or the transition of old stock were still open.

Outcome

For dilutions and ampoules, item creation was complete and numerous production runs had already taken place. For the cough elixir, a manufacturing issue remained to be resolved; for ointments, the sell-off of existing stock was scheduled. Operations thus had a reliable transfer status for each preparation.