Project rescue, claims management and commercial recovery of a major project
Situation
A major international project of an industrial and plant engineering service provider was largely complete operationally, but commercially in a critical situation. Project costs and construction effort were considerably above the original estimate; at the same time, the client had substantial counterclaims.
Challenge
Numerous changes during project execution had led to considerable additional effort. Project controlling and documentation were inadequate, changes and variation requests had in part not been processed systematically, and claims had not been built up in time. Key billing documents and technical evidence had to be reconstructed after the fact. A loss in the double-digit millions threatened.
Approach
Mobilisation of experienced specialists in project management, controlling and contract management. Systematic reconstruction of project history, scope, drawings, site diaries, timesheets and correspondence. Development of a technical and contractual claims strategy, and preparation and conduct of negotiations with the client. In parallel, lessons were drawn for project approval, resource review, project controlling and claims management.
Outcome
A substantial part of the additional work caused by changes could be substantiated technically and contractually. The company’s own claims offset a considerable share of the counterclaims, and the completed work was paid for. The threatened loss in the double-digit millions was reduced to a low single-digit million amount. In addition, binding approval processes and a PMO with standards for controlling, reporting and claims management were established.