Warehouse management system introduced for ongoing warehouse and shipping operations
Situation
As part of the modernisation of an existing logistics facility, a consumer goods group introduced a new warehouse management system. In addition to operational warehouse management, the different processes in freight shipping and the pallet warehouse had to be taken into account.
Challenge
When switching warehouse control, physical stock and system stock had to match. Batch-based consignment was particularly demanding: the WMS and ERP had to represent the same goods movement traceably for both warehouse management and billing. At the same time, operations needed clear responsibilities for technical faults and the assignment of user rights.
Approach
We took on overall project management for the WMS implementation in the existing warehouse. In the requirements specification, we defined warehouse processes and system requirements. For further implementation stages, we planned freight shipping and the pallet warehouse separately. We clarified how consignment would be represented between WMS and ERP, defined the tasks of the technical control centre and established responsibility for setting up users and roles.
Outcome
The WMS implementation improved the efficiency of warehouse processes. Clearly scoped requirements were in place for the subsequent expansion stages. Inventory management, authorisations and fault handling were thus anchored in the implementation plan as operational tasks.